Contract Amount: $2,500,000.00
Owner: City of Irving, TX
Scope of Work: Concrete repair of sidewalks, utility cuts, streets, alleys, and other concrete structures. Installation of integral curb, drive approaches, reinforced concrete barrier-free ramps, new sidewalks, channel lining repair, formed concrete flumes, irrigation lines, and interlocking pavers.
Status: Ongoing
Contract Amount: $1,500,000.00
Owner: City of Irving, TX
Scope of Work: Full concrete repair program including sidewalks, streets, and alleys.
Contract Amount: $1,400,000.00
Owner: City of Lancaster, TX
Scope of Work: Milling and overlay of Donnelly Road. Removed 6 inches of asphalt, stabilized base with 8-inch concrete, and installed new asphalt surface.
Contract Amount: $445,614.90
Owner: City of Mesquite, TX
Scope of Work: Full-depth removal, milling, and reconstruction of asphalt roadway.
Contract Amount: $1,038,884.00
Owner: City of Dallas, TX
General Contractor: Harrison, Walker & Harper LP
Role: Minority Subcontractor
Scope of Work: All site utilities, concrete work, parking lot slab, piers, and beams.
Contract Amount: $221,960.00
Owner: City of Dallas, TX
General Contractor: Harrison, Walker & Harper LP
Role: Minority Subcontractor
Scope of Work: Site utilities including water and storm shelters.
Annual Contract Amount: $350,000.00
Owner: City of Arlington, TX
Scope of Work: Ongoing concrete repair of sidewalks, utility cuts, streets, and alleys.
Contract Amount: $280,000.00
Owner: City of Balch Springs, TX
Scope of Work: Annual concrete street, HMAC street, and sidewalk repairs.
Contract Amount: $149,500.00
Owner: City of Balch Springs, TX
Scope of Work: Complete removal and replacement of concrete bridge.
Group 17-1204: $973,000.00
Group 17-1003: $1,650,070.00
Group 17-9001: $1,413,070.00
Owner: City of Dallas, TX
Scope of Work: Full alley reconstruction including concrete removal, replacement, utilities, and site restoration.
City of Desoto – 2017 & 2018 Alley Reconstructions ($1,277,863 + $397,900)
City of Duncanville – Cherry & Center Street Alley Reconstruction (2024) ($395,000)
City of Duncanville – Alley Improvements (2021) ($331,415)
City of Heath – Concrete Repair Program (2020–2021) ($300,000)
A+ Academy Charter School (Ongoing – $1,000,000+ in annual work orders)
St. Paul Lutheran Church (2022 – Flooring replacement)
Trinity River Authority of Texas (2021 – Parking lot & utilities)